So, our first day of work inside “The Hub” has gone smoothly; We’ve managed to organise several boxes of computer equipment down to the essentials. The room was full of “junk”, I say that loosely as alot of the items there belonged to the artists so I was unsure of what it would be used for. Greg mentioned that the room would be cleared on Monday so I hope on our return visit it should be easier to move around.
We noticed that the room is wired up for CAT5, this is a massive timesaver as the least enjoyable part of the job would be wiring network cable up. Cream, the previous owners, must of had a fully wired network in the building at some point, so all we need to do is find where the cables drop out at.
We’ll be returning on Wednesday to do some further cleaning and organisation, hopefully we will be able to locate the missing drop point for those network cables. If anyone is interested in doing some heavy lifting and tidying your more than welcome to come along and help out!